Implementing Value Engineering Standards

Reducing Costs & Enhancing Efficiency

Value engineering is applied throughout all project phases, from planning and design to construction, operation, and maintenance. It serves as an effective tool to align the project’s scope with the required quality standards and the allocated budget.

  • Our team at Dar Project Management monitors project value from its inception through all phases of execution. This proactive approach aims to minimize the risks of costly design modifications or major system changes.

  • By utilizing a methodology focused on achieving the required functions at the lowest possible cost while maintaining design objectives, a range of benefits is realized, including:

    • Reducing construction costs.
    • Lowering lifecycle expenses.
    • Enhancing operational efficiency.
    • Cutting maintenance costs.
    • Identifying risks and developing mitigation plans.
  • We offer specialized value engineering workshops conducted by multidisciplinary teams comprising architects, structural, civil, mechanical, and electrical engineers, tailored to the project’s requirements. This collaborative approach engages the client, the architectural/engineering (A/E) team, and the project manager. The value engineering study encompasses three primary phases:

1. The Preparation Phase Before the Study

At this stage, all necessary preparations and planning are conducted to initiate the value engineering study. The key activities include:

All project-related documents and information are gathered, including designs, specifications, schedules, budgets, and past performance reports, if available.

The objectives of the value engineering study are established based on the client’s needs and the project’s characteristics. These objectives aim to enhance efficiency and reduce costs while maintaining design quality.

A multidisciplinary team is selected, comprising engineers from various fields (architectural, civil, mechanical, electrical, and others), along with the client and representatives from the design and construction teams. The goal is to ensure that all aspects of the project are thoroughly addressed.

Value engineering workshops are planned, with a timeline carefully set to allow for the presentation of ideas and recommendations before critical decisions are made in the design or construction phases.

2. The Value Engineering Study Phase

This phase represents the core of the value engineering process—the workshop where the project is analyzed from all perspectives. The activities are carried out as follows:

The project is thoroughly analyzed to understand its objectives and core functions. The aim is to gain a clear understanding of functional requirements and identify opportunities for improvement.

Multiple ideas are generated to enhance the design or process and reduce costs without compromising the quality or performance of the project. The team is encouraged to think creatively and propose new and innovative concepts.

The generated ideas are analyzed based on criteria such as efficiency, cost, and feasibility. Each idea is assessed to determine its overall impact on the project.

Selected ideas are developed into actionable solutions. Final recommendations are presented to the client and the design team, including details of potential costs and the expected benefits of each recommendation.

3. The Post-Value Engineering Phase

In this phase, the ideas and recommendations developed during the workshop are implemented. This stage includes:

  • Incorporating Modifications: Once the recommendations are approved by the client and the design team, necessary adjustments are made to the design or construction plans. These adjustments may involve improvements in materials, system simplifications, or optimizing construction schedules.

  • Monitoring Implementation: The execution of the recommendations is closely monitored to ensure they achieve the desired objectives. This process may include reviewing actual costs versus initial estimates and evaluating the performance of the modified systems.

  • Documentation: All activities during the study and implementation phases are thoroughly documented, including the benefits achieved and challenges overcome. This documentation contributes to a knowledge base that can be used in future projects to enhance performance and apply best practices.